In this Dec. 18, 2020 photo, pipes to be used for the Keystone XL pipeline are stored in a field near Dorchester, Neb. THE CANADIAN PRESS/AP-Chris Machian /Omaha World-Herald via AP

In this Dec. 18, 2020 photo, pipes to be used for the Keystone XL pipeline are stored in a field near Dorchester, Neb. THE CANADIAN PRESS/AP-Chris Machian /Omaha World-Herald via AP

TC Energy halts spending on Keystone XL, says it’s ‘disappointed’ with Biden move

TC Energy said it will stop capitalizing costs, including interest during construction,

Work on the Keystone XL project is being suspended in anticipation of U.S. president-elect Joe Biden revoking its vital presidential permit once he is sworn in, Calgary-based TC Energy Corp. said Wednesday.

The company said it is “disappointed” with Biden’s action expected later today, adding it will overturn extensive regulatory reviews that found the pipeline would transport needed energy in an environmentally responsible way and bolster North American energy security.

It warned the move will lead to the layoffs of thousands of union workers and comes despite its commitments to use renewable energy to power the pipeline and forge equity partnerships with Indigenous communities.

Francois Poirier, who took over as TC Energy CEO at the beginning of the year, said in a statement the company remains committed to growing earnings and dividends through its investments in critical energy infrastructure even if Keystone XL doesn’t go ahead.

“Our base business continues to perform very well and, aside from Keystone XL, we are advancing $25 billion of secured capital projects along with a robust portfolio of other similarly high-quality opportunities under development,” he said.

TC Energy said it will stop capitalizing costs, including interest during construction, effective Wednesday, and will evaluate the carrying value of its investment in the pipeline, net of project recoveries.

It says this will likely result in “substantive” mostly non-cash writedowns in its first-quarter financial results.

Meanwhile, environmental groups applauded Biden’s expected move.

“Killing the Keystone XL pipeline once and for all is a clear indication that climate action is a priority for the White House. This should not come as a surprise to anyone,” said Dale Marshall, national climate program manager for Canada’s Environmental Defence.

“We should take heed when the biggest customer for Canada’s oil kills a pipeline that is already under construction. The Keystone XL pipeline never made sense for either the U.S. or Canada.”

In contrast, Saskatchewan Premier Scott Moe said it’s “incredibly troubling” that TC Energy has suspended work on Keystone XL.

“Now is the time for our nations to strengthen our trading relationship, not erect further barriers to collaborative and sustainable development,” he said in a statement.

The Progressive Contractors Association of Canada said in a news release it is disappointed that Biden is “putting politics before reason” in his anticipated decision to rescind the pipeline permit.

“Pulling the plug on a major project, hours after taking office, is a rocky starting point for re-setting Canada/U.S. relations,” said PCAC president Paul de Jong.

The association, whose member companies employ thousands of Alberta and B.C. construction workers, said the pipeline would have generated as many as 60,000 direct and indirect jobs in Canada and the United States.

On Tuesday, Alberta Premier Jason Kenney urged Prime Minister Justin Trudeau in a phone conversation to continue his efforts to press Biden to allow Keystone XL to proceed.

Kenney’s government has invested $1.5 billion directly in the project, along with loan guarantees, and he has said about $1 billion is at risk if the project is killed.

The 1,947-kilometre pipeline is designed to carry 830,000 barrels a day of crude oil from Hardisty, Alta., to Steele City, Neb. From there it would connect with the company’s existing facilities to reach the U.S. Gulf Coast — one of the world’s biggest oil refining hubs.

TC Energy announced a plan Sunday for the Keystone XL project to achieve net zero emissions by spurring an investment of over US$1.7 billion in communities along the Keystone XL footprint to create about 1.6 gigawatts of renewable electric capacity.

READ MORE: Documents show Biden plans to issue order to cancel Keystone XL on first day in office

The Calgary-based company has also struck a deal with four labour unions to build the pipeline and has an agreement in place with five Indigenous tribes to take a roughly $785 million ownership stake.

Some 200 kilometres of pipe have already been installed for the expansion, including across the Canada-U.S. border, and construction has begun on pump stations in Alberta and several U.S. states.

Biden was vice-president in 2015 when Barack Obama rejected Keystone XL for fear it would worsen climate change.

Trump approved it again in March 2019.

Dan Healing, The Canadian Press


Like us on Facebook and follow us on Twitter.

Want to support local journalism during the pandemic? Make a donation here.

Joe BidenKeystone XL

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

A soldier walks along the outside of a crater formed through a demolition. Photo: Aaron Hemens
Military exercises assist with restoration of Lower Kootenay Band wetlands

A total of nine craters were created through demolitions, where the goal is to have them serve as future habitats for ducks and geese.

Fields Forward’s fruit press machine. (File photo)
Regional food processing facility coming to Creston

The facility will produce juices from fruits and vegetables, package vegetables for institutions, bottle jams, freeze-dry products into powders and provide other food processing services.

Al Garrecht holds up a plaque acknowledging his “service above self” from the Creston Valley Rotary Club during a tribute meeting on Feb. 9, 2021. Photo: Dave Handy
Creston Valley Rotary Club bids farewell to longtime member Al Garrecht

“Thank you, Al Garrecht. You leave an incredible legacy of service with CVRC. You live our motto, ‘Service Above Self’. Thank You.”

A nurse performs a test on a patient at a drive-in COVID-19 clinic in Montreal, on Wednesday, October 21, 2020. (THE CANADIAN PRESS/Paul Chiasson)
30 new COVID-19 cases, five more deaths in Interior Health

This brings the total number of cases to 7,271 since testing began

Frisky Whisky owner Cori Karountzos, left, and Frisky Whisky manager Marissa Bilcik. Photo: Aaron Hemens
Creston’s Frisky Whisky wins two business awards in its inaugural year

The 1920’s style Speakeasy tapas lounge won the best in customer service for small businesses award, as well as the best in hospitality and tourism award.

Dr. Bonnie Henry talk about the next steps in B.C.'s COVID-19 Immunization Plan during a press conference at Legislature in Victoria, B.C., on Friday, January 22, 2021. THE CANADIAN PRESS/Chad Hipolito
456 new COVID-19 cases in B.C., 2 deaths

Since January 2020, 78,278 have tested positive for the novel coronavirus in B.C.

A health-care worker prepares a dose of the Pfizer-BioNTech COVID-19 vaccine at a UHN COVID-19 vaccine clinic in Toronto on Thursday, January 7, 2021. (THE CANADIAN PRESS/Nathan Denette)
Vaccinating essential workers before seniors in B.C. could save lives: experts

A new study says the switch could also save up to $230 million in provincial health-care costs

The late Michael Gregory, 57, is accused of sexually exploiting six junior high students between 1999 and 2005. (Pixabay)
Former Alberta teacher accused of sexually assaulting students found dead in B.C.

Mounties say Michael Gregory’s death has been deemed ‘non-suspicious’

Cannabis bought in British Columbia (Ashley Wadhwani/Black Press Media)
Is it time to start thinking about greener ways to package cannabis?

Packaging suppliers are still figuring eco-friendly and affordable packaging options that fit the mandates of Cannabis Regulations

According to a new poll, a majority of Canadians want to see illicit drugs decriminalized. (THE ASSOCIATED PRESS)
Majority of Canadians think it’s high time to decriminalize illicit drugs: poll

More than two-times the B.C. residents know someone who died from an overdose compared to rest of Canada

Interior Health officially declared a COVID-19 outbreak at Creekside Landing in Vernon on Jan. 3, which was followed by the first death from the virus 10 days later. (Kaigo photo)
COVID outbreak over at Vernon care home

Creekside Landing cleared of coronavirus, despite additional death in last day

Photograph By @KAYLAXANDERSON
VIDEO: Lynx grabs lunch in Kamloops

A lynx surprises a group of ducks and picks one off for lunch

(Black Press Media file photo)
B.C. residents can reserve provincial camp sites starting March 8

B.C. residents get priority access to camping reservations in province

Most Read